Factory overhead is Rs 3,00,000 and direct material cost is Rs 5,00,000 What is the overhead rate under direct material cost method?
Factory overhead is Rs 3,00,000 and direct material cost is Rs 5,00,000 What is the overhead rate under direct material cost method? Correct Answer 60%
Overhead rate = Factory overhead / Direct material cost * 100= 300000 / 500000 * 100 = 60%.
মোঃ আরিফুল ইসলাম
Feb 20, 2025