There are multiple steps involved. The first stage involves planning and design, and the second stage is engineering. Once the engineering is approved, your pool contractor will move on to permitting. When the permitting is also approved, your contractor will confirm the pool's "footprint" with you. Then, you'll move onto excavation and pool installation.