About 40 million people (over 75% are children) are affected by water borne diseases every year. Nearly six million children below 14 years of age suffer from fluorosis due to fluoride contamination in water. Arsenic is another dangerous contaminant in ground water, putting at risk more than 10 million people in the country. Bacteriological contamination, which leads to diarrhea, cholera, hepatitis etc., is at alert level in India. Contamination due to Iron, hardness and salinity in water are other major concern. Medical expenditure on water borne diseases is estimated to be Rs. 2400 crores annually in the country. The need for desalination and water purification is destined to grow in the coming years as the requirement for water increases. Bhabha Atomic Research Centre (BARC) has been engaged in R&D on desalination and water purification technologies for several years and has developed indigenous technologies which are available for know-how transfer to interested parties The given information, if accurate, most accurately supports which statement?

About 40 million people (over 75% are children) are affected by water borne diseases every year. Nearly six million children below 14 years of age suffer from fluorosis due to fluoride contamination in water. Arsenic is another dangerous contaminant in ground water, putting at risk more than 10 million people in the country. Bacteriological contamination, which leads to diarrhea, cholera, hepatitis etc., is at alert level in India. Contamination due to Iron, hardness and salinity in water are other major concern. Medical expenditure on water borne diseases is estimated to be Rs. 2400 crores annually in the country. The need for desalination and water purification is destined to grow in the coming years as the requirement for water increases. Bhabha Atomic Research Centre (BARC) has been engaged in R&D on desalination and water purification technologies for several years and has developed indigenous technologies which are available for know-how transfer to interested parties The given information, if accurate, most accurately supports which statement? Correct Answer The voice of the author is one of caution, and he/she wants to warn the reader as to what is going to happen.

The authors voice is clearly one of concern, as he/she speaks about the issues of water sanitation and the impending need for desalination and water purification technologies. Hence, option 1 is clearly correct.

Option 2 in invalid, as it is clearly mentioned that contamination due to iron, hardness, and salinity in water, are other major concerns. Although option 3 makes sense, it is not a point being made by the author of the paragraph, and hence, is invalid. Option 4 is factually wrong, as the need for water purification is going to grow, as the years go by.

Hence, option 1 is the correct option.

Related Questions

The question given below consists of a statement, followed by three arguments I, II and III. You have to decide which of the arguments is/are ‘strong’ arguments is/are ‘weak’ arguments and accordingly choose your answer from the alternatives given below each question. Statement: Chat bots and other interfaces are saving employees and HR heads time for more productive activities by providing information and replies to diverse queries or concerns. A few years ago, business communication was driven by multiple faxes in a day and emails were the only quick mode of exchanging information. This information went through the organisation's who's who, while the others were mostly engaged in the daily rut of redundant activities, preventing them from directing their capabilities towards more productive areas. Which of the following arguments brig out the idea that introduction of chat bots and other interfaces is not helping in boosting up the processes? Arguments: I. Using these conversational interfaces, HR departments are successfully aligning themselves with the swiftly-changing organisational processes. These platforms represent people friendly technologies that keep employee experience at the centre, continuously evolving with them.  II. HR technologies are increasingly using advanced machine learning for measuring and analysing workforce engagement. Sentiment analysis is a unique way of gauging an employee's disposition towards the organisation, providing valuable insights essential for improving productivity and predicting attrition rates.  III. The seamless experience chat bots provide makes employees focus on activities that require critical abilities and strategic thinking. Besides enabling HR processes such as generating leave applications and reimbursement forms, the use of chatbots provides quick and smooth access to data from anywhere, anytime. 
The question given below consists of a statement, followed by three arguments I, II and III. You have to decide which of the arguments is/are ‘strong’ arguments is/are ‘weak’ arguments and accordingly choose your answer from the alternatives given below each question. Statement: For users, Facebook's revelation of a data breach that gave attackers access to 50 million accounts raises an important question: What happens next? For the owners of the affected accounts, and of another 40 million that Facebook considered at risk, the first order of business may be a simple one: sign back into the app. Facebook logged everyone out of all 90 million accounts in order to reset digital keys the hackers had stolen - keys normally used to keep users logged in, but which could also give outsiders full control of the compromised accounts.  Which of the following points do not capture the negligence of Facebook in the most appropriate manner? Arguments: I. What Facebook knows so far is that hackers got access to the 50 million accounts by exploiting three distinct bugs in Facebook's code that allowed them to steal those digital keys, technically known as ‘access tokens’. The company says it has fixed the bugs.  II. The hack is the latest setback for Facebook during a tumultuous year of security problems and privacy issues . So far, though, none of these issues have significantly shaken the confidence of the company's 2 billion global users.  III. One of the bugs was more than a year old and affected how the ‘View As’ feature interacted with Facebook's video uploading feature for posting ‘happy birthday’ messages. But it wasn't until mid-September that Facebook noticed an uptick in unusual activity, and not until this week that it learned of the attack.
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
Which of the following were not problems faced while constructing the pipeline?
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
The Alaskan pipeline ends
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
What is the capacity of the Alaskan pipeline?