High load factor indicates A cost of generation per unit power is increased B total plant capacity is utilised for most of the time C total plant capacity is not properly utilised for most of the time D none of the above High load factor indicates Correct Answer total plant capacity is utilised for most of the time Bissoy MCQ Team Electrical Engineering Economics of Power Generation