The Hoyer’s system of prestressing proves to be economical for ___________

The Hoyer’s system of prestressing proves to be economical for ___________ Correct Answer Post tensioning system

The post tensioning system was considered as economical when compared to pre tensioning system, when used for larger spans due to this reason pre tensioning system was replaced by post tensioning system, for mass production of pretensioned elements, the long line process developed by Hoyer is generally used in the factory and in this method the tendons are stretched several hundred meters apart so that a number of similar units may be cast along the same group of tensioned wires.
Bissoy MCQ

Related Questions

The bond of prestressing wires in Hoyer’s system can be formed by ___________
The Hoyer’s method of prestressing is done by ___________
Hoyer’s system of pre tensioning is generally adopted for ___________
In Hoyer’s system the projection of plugs left in concrete exceeds beyond ___________
Hoyer’s system of pretensioning can be done for beams.
In Lee-McCall system, the prestressing tendons are in the form of ___________