The Hoyer’s method of prestressing is done by ___________

The Hoyer’s method of prestressing is done by ___________ Correct Answer Pulling out of wires

Hoyer’s system of prestressing involves pulling out of wires between two bulkheads which are separated at large distances in order to produce a larger number of beams in an individual alignment, the concrete is to be poured by providing appropriate shuttering between the beams and then the wires are united after hardening of concrete and cutoff.