In many circuits, the current return path is designated as ground.

In many circuits, the current return path is designated as ground. Correct Answer True

If there is a wire carrying current from one device to another, there has to be a second wire for the current to flow back. When an equipment is designed for balanced connections, there is a second wire inside the cable for the current to flow back. In many circuits, the current’s return path is designated as ground.

Related Questions

The conditions regarding selection from a list of suitable candidates to be called for interview after a written examination for appointment of management-level persons to a multi-national company providing accounting services and sales are mentioned below. Candidates: a) Must have a Bachelor's degree in Basic Science with 65% or more marks or BE with 55% or more marks. b) Must have passed the examination with 70% or more marks. c) Age must be between 25 to 30 years as of 1/4/18. d) Must have 3 years of experience in an Accounting Institution and must have a Diploma in Accounting with 60% or more marks. e) Must be currently getting CTC of Rs. 6 lakh or more per annum. If the candidate: 1) If he fulfills all the other conditions other than A above, he will be designated as Junior Accountant. 2) If he fulfills all the other conditions other than (d) and (e) above, he can be designated as Trainee-Accountant. If he fulfills all the above conditions including 5 years of experience, he can be designated as a Senior Accountant. He can be designated as Manager (Accounts) if he fulfills all the above criteria including educational qualifications of CA/ ICWA/ MBA (Finance). Study all the above information and answer the following question. Varun has passed the CA exam and has a bachelor's degree in basic science and a diploma in accountancy, having scored 75% or more in the written examination during his entire career and also in the written examination. His age is 27 years and with 4 years of experience in Accountancy, he has a CTC salary of 18 lakhs per annum. To which of the following positions can he be referred? Select from the given options.
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
The Alaskan pipeline ends
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
What is the capacity of the Alaskan pipeline?