1 Answers
If you are installing a new half bath to an area and no framing is being removed, it is simply a matter of framing in the extra walls and having the plumbing or electrical run in. Plumbing and electrical need to be inspected prior to covering the walls with drywall or other wall coverings, and need to be done by qualified professionals. If you need to remove any framing to build the new half bath, you must ensure that you are not cutting into a load-bearing wall. If you have any questions or are unsure, professional assistance is highly recommended.
4 views
Answered