The time which results in the least possible construction cost of an activity, is known as
-
Construction team means
-
Railway projects are treated as
-
While filling the tender for any work, the contractor considers
-
Whenever an activity has zero total float, then
-
The direct cost of a project with respect to normal time is
-
If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be
-
The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as
-
Economic saving of time results by crashing
-
Frequency distribution curves
-
In resources levelling
-
Sensitivity analysis is a study of
-
Sinking fund is
-
Which of the following does not represent an activity?
-
Site order book is used for recording
-
Grader is used mainly for
-
Completion of an activity on CPM network diagram, is generally known
-
Which of the following earth moving machines has the shortest cycle time?
-
The reduction in project time normally results in
-
Which one of the following represents an event?
-
Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?
-
The technique for establishing and maintaining priorities among the various jobs of a project, is known
-
Final technical authority of a project lies with
-
While scheduling a project by C.P.M.
-
The constraints in case of resource smoothening operation would be
-
The basic action involved in sheep foot rolling is
-
Pick up the PERT event from the following:
-
At a work site, statistical quality control of concrete means
-
In PERT analysis, the time estimates of activities and probability of their occurrence follow
-
During the construction period, price variation clause in contracts caters to