The Tehri dam reservoir in Uttarakhand touched the level of how many metres, its full reservoir level (FRL) for the first time, in September 2021?

The Tehri dam reservoir in Uttarakhand touched the level of how many metres, its full reservoir level (FRL) for the first time, in September 2021? Correct Answer 830 

The correct answer is 830 metres.

Key Points

  • The Tehri dam reservoir in Uttarakhand touched the level of 830 metres, its full reservoir level (FRL) for the first time, on 24 September 2021.
  • Tehri dam project is a multipurpose hydro power scheme on the Bhagirathi river and is the third-highest among earth-fill dams and tenth highest among all dams of the world.
  • It has a capacity to store about 2615 mcm of surplus floodwater during the monsoon.

Additional Information

  • ​Uttarakhand:
    • Chief Minister - Pushkar Singh Dhami.
    • Governor - Gurmit Singh.
    • Lok Sabha seats - 5.
    • Rajya Sabha seats - 3.

Related Questions

How far is point 'R' from Point 'T'? Statement (I): Point 'R' is 5 metres to the north of point 'M'. Point 'U' is 4 metres to the east of point 'R'. Point 'T' is to the west of point 'R' such that points 'U' 'R' and 'T' form a straight line of  metres. Statement (II): Point 'Z' is metres to the south of point 'T'. Point 'U' is  metres to the east of point 'T'. Point 'M' is  metres to the east of point 'Z'. Point 'R' is  metres to the north of point 'M'. Point 'R' lies on the line formed by joining points 'T' and 'U'.