Related Questions

Critical path on PERT/CPM chart is obtained by joining the events having
Activity slack or float of any event on a PERT/CPM chart is represented by
In PERT analysis, critical path is obtained by joining events having
Critical path of the PERT chart is:
When the addenda on pinion and wheel is such that the path of approach and path of recess are half of their maximum possible values, then the length of the path of contact is given by (where r = Pitch circle radius of pinion, R = Pitch circle radius of wheel and $$\varphi $$ = Pressure angle)
Slack is the calculated time span within which the event must occur:
Slack time refers to

Next steps