Which of the following control system involves the control of pathway after the branch point to the product?
Which of the following control system involves the control of pathway after the branch point to the product? Correct Answer Sequential
Sequential control system is a system where each end product of the pathway controls the enzyme immediately after the branch point to the product. This mechanism usually results in an accumulation of the last metabolite od biological pathway.
মোঃ আরিফুল ইসলাম
Feb 20, 2025