Cpm is the second generation process capability ratio.
Cpm is the second generation process capability ratio. Correct Answer True
Cpk and Cpm were designed after the first generation capability ratios, which were not able to consider the process centering fact into their evaluation. So they are called the second gen. process capability ratios.
মোঃ আরিফুল ইসলাম
Feb 20, 2025