Proper type of control charts to be prepared, must be chosen after choosing the point in the process at which the control charts will be implemented.

Proper type of control charts to be prepared, must be chosen after choosing the point in the process at which the control charts will be implemented. Correct Answer False

It is necessary to point out the location where the charts will be implemented, before choosing the control charts to be prepared. This is because the location of implementing charts can reveal more important factors to be considered while choosing the proper control chart.

Related Questions

How far is point 'R' from Point 'T'? Statement (I): Point 'R' is 5 metres to the north of point 'M'. Point 'U' is 4 metres to the east of point 'R'. Point 'T' is to the west of point 'R' such that points 'U' 'R' and 'T' form a straight line of  metres. Statement (II): Point 'Z' is metres to the south of point 'T'. Point 'U' is  metres to the east of point 'T'. Point 'M' is  metres to the east of point 'Z'. Point 'R' is  metres to the north of point 'M'. Point 'R' lies on the line formed by joining points 'T' and 'U'.