When a change in product specification is desired, which of these control charts should be used?
When a change in product specification is desired, which of these control charts should be used? Correct Answer x And R charts
The variable control charts should be used whenever a new process is coming on stream, or a new product is being manufactured by an existing process, or a change in product specification is desired.
মোঃ আরিফুল ইসলাম
Feb 20, 2025