In _________________ type of crane, heavy temporary staging or platform is prepared for the working of the crane.
In _________________ type of crane, heavy temporary staging or platform is prepared for the working of the crane. Correct Answer Goliath
In Goliath cranes, heavy loads can be shifted over considerable distances. These cranes are costly and are used in the construction of Harbour works, shops of steel work, etc.
মোঃ আরিফুল ইসলাম
Feb 20, 2025