A _________ layer is in proportion 1:2:4 is generally provided at the plinth level to work as a damp proofing course.
A _________ layer is in proportion 1:2:4 is generally provided at the plinth level to work as a damp proofing course. Correct Answer Cement concrete
The depth of cement concrete layer varies from 40 mm to 150 mm. It stops the rise of water by capillary action and it is found to be effective at places where them is not excessive.