For an SCR the total turn-on time consists of i) Delay time ii) Rise time and iii) Spread time During the rise time the
For an SCR the total turn-on time consists of i) Delay time ii) Rise time and iii) Spread time During the rise time the Correct Answer losses are maximum
The losses are maximum during the rise time because both Ia & Va are high.
মোঃ আরিফুল ইসলাম
Feb 20, 2025