Which of the following determines the next task in the time slice method of task swapping?
Which of the following determines the next task in the time slice method of task swapping? Correct Answer scheduling algorithm
The time slice mechanism can also be used as a scheduling method in which the task to run next is determined by the scheduling algorithm.
মোঃ আরিফুল ইসলাম
Feb 20, 2025