Once the ICW1 is loaded, then the initialization procedure involves
Once the ICW1 is loaded, then the initialization procedure involves Correct Answer all of the mentioned
The initialization procedure involves i) edge sense circuit is reset. ii) IMR is cleared. iii) IR7 input is assigned the lowest priority. iv) slave mode address is set to 7 v) special mask mode is cleared and the status read is set to IRR.
মোঃ আরিফুল ইসলাম
Feb 20, 2025