Which of the following statement is/are incorrect? The pipeline between Naharkatia and Nunmati became operative in 1962 and that between Nunmati and Barauni in 1964. Nunmati-Siliguri pipeline transport oil from Nunmati in Assam to Siliguri in West Bengal. Naharkatia-Nunmati-Barauni Pipeline was the third pipeline constructed in India to bring crude oil from Naharkatia oilfield to Nunmati. Select the incorrect code from below.
Which of the following statement is/are incorrect? The pipeline between Naharkatia and Nunmati became operative in 1962 and that between Nunmati and Barauni in 1964. Nunmati-Siliguri pipeline transport oil from Nunmati in Assam to Siliguri in West Bengal. Naharkatia-Nunmati-Barauni Pipeline was the third pipeline constructed in India to bring crude oil from Naharkatia oilfield to Nunmati. Select the incorrect code from below. Correct Answer Only 3
The correct answer is Only 3.
Naharkatia-Nunmati-Barauni Pipeline:
- Naharkatia-Nunmati-Barauni Pipeline was the first pipeline in India to bring crude oil from Naharkatia oilfield to Nunmati.
- Later it was extended to transport crude oil to the refinery at Barauni, Bihar.
- It is 1167 km long.
- It is now extended to Kanpur in UP.
- This pipeline between Naharkatia and Nunmati operated in 1962 and between Nunmati and Barauni in 1964.
- Nunmati-Siliguri pipeline transport oil from Nunmati in Assam to Siliguri in West Bengal.
- Lakwa-Rudrasagar-Barauni pipeline has been constructed to carry crude oil from Lakwa and Rudrasagar for oil refinery at Barauni.
- Barauni-Kanpur pipeline carries refined petroleum products from Barauni to Kanpur.