To complete the work in time

In 8 days, required number of worker = 54

In 3 days, required number of worker = 54×83=144

Primarily, each worker got =324054=60 taka

Later, each worker got = 3240144 = 22.5taka

Each worker will receive = 60-22.5 37.5 Taka less. (Answer).