A firm's SMC schedule is shown in the following table. The total fixed cost of the firm is Rs. 100.00. Find the TVC, TC, AVC and SAC schedules of the firm.

Output 1 2 3 4 5 6
TC 50 65 75 95 130 185
4 views

1 Answers

Output(units)  SMC(Rs.) TFC(Rs.) TVC(Rs.) TC(Rs.) AVC(Rs.) SAC(Rs.)
0 - 100 0 100 - -
1 500 100 500 600 500 600
2 300 100 800 900 400 450
3 200 100 1000 1100 333.33 366.67
4 300 100 1300 1400 325 350
5 500 100 1800 1900 360 380
6 800 100 2600 2700 433.33 450

4 views