The following table shows the total cost schedule of a firm. What is the total fixed cost schedule of this firm?
The following table shows the total cost schedule of a firm. What is the total fixed cost schedule of this firm? Calculate the TVC, AFC, AVC, SAC and SMC schedules of the firm.
| L | TC |
| 0 | 10 |
| 1 | 30 |
| 2 | 45 |
| 3 | 55 |
| 4 | 70 |
| 5 | 90 |
| 6 | 120 |
4 views
1 Answers
| L | TC | TFC = TC - TVC | TVC = TC - TFC | AFC = TFC/Q | AVC = TVC/Q | SAC = AFC + AVC | SMC = TCn - TCn - 1 |
| 0 | 10 | 10 | 0 | - | - | - | - |
| 1 | 30 | 10 | 20 | 10 | 20 | 30 | 20 |
| 2 | 45 | 10 | 35 | 5 | 17.5 | 22.5 | 15 |
| 3 | 55 | 10 | 45 | 3.33 | 15 | 18.33 | 10 |
| 4 | 70 | 10 | 60 | 2.5 | 15 | 17.5 | 15 |
| 5 | 90 | 10 | 80 | 2 | 16 | 18 | 20 |
| 6 | 120 | 10 | 110 | 1.66 | 18.33 | 19.99 | 30 |