1 Answers

Option 3 : 7 days

Given:

A can complete the work in 14 days

B can complete the work in 20 days

A + B together work for some days and then A left 

Total work completed in 10 days

Calculation:

A = 14 days

B = 20 days

Total work = LCM(14,20) = 140 unit

⇒ One day's work of A = 140/14 = 10

⇒ One day's work of B = 140/20 = 7

Let A and B worked together for X days, and then A left

⇒ B alone worked for (10 - X) days

Total work = ((10 + 7) × X) + (7 × (10 - X)) = 140

(17 × X) + 70 - (7 × X) = 140

(17 × X)  - (7 × X) = 140 - 70

10 × X = 70

X = 7

⇒ A and B worked together for 7 days and then A left

∴ A left after 7 days

Shortcut Trick

LCM of A and B is 140

The efficiency of A = 10

The efficiency of B = 7

B worked for 10 days

= 7 × 10 = 70

Remaining work done by A

= (140 - 70)/10 = 7 days.

∴ A left after 7 days

9 views