Bissoy.com
Login
Doctors
Medicines
MCQs
Q&A
Ask
Merit Test
Questions
Courses
For crushing of solids, the Rittinger's law states that the work required for crushing is proportional to?
The new surface created
The size reduction ratio
The change in volume due to crushing
None of these
LohaHridoy
0
Edit
4
views
2025-01-04 04:42
1
Answers
AhmedNazir
Answer: Option 1
0
Thanks
4
views
Answered
2022-09-01 13:21
Report
Edit
Call
Related Questions
Assertion A : Large size stones are required in stone revetment in shore protection.Reason R : Resistance of stone to wave force is proportional to its volume and wave force is proportional to the exposed area of the stone.Select your answer based on the coding system given below.?
1 Answers
6
Views
Rittinger's number designates the new surface created per unit mechanical energy absorbed by the material being crushed. Larger value of Rittinger's number of a material indicates its?
1 Answers
4
Views
Rittinger's crushing law states that?
1 Answers
6
Views
Choke crushing (in case of a Jaw crusher) compared to free crushing?
1 Answers
6
Views
The constants (Kb, Kr and Kk) used in the laws of crushing (i.e., Bond's law, Rittinger's law and Kick's law) depend upon the?
1 Answers
4
Views
The work index in Bond's law for crushing of solids has the following dimensions?
1 Answers
7
Views
P can complete \(\frac{1}{4}\) of a work in 10 days, Q can complete 40% of the same work in 145 days. R completes \(\frac{1}{3}\) of the work in 13 days and S, \(\frac{1}{6}\) of the work in 7 days. Who will be able to complete the work first?
1 Answers
5
Views
A can do a piece of work in 8 hours and B can do the same work in 12 hours. If A starts the work at 9∶00 A.M. and they both are doing the work alternately, then find at what time they will complete the whole work.?
1 Answers
5
Views
Biswas takes 12 days more than Ashit to complete the particular work. Biswas and Ashit start the work and Ashit leaves the work 12 days before the work is completed. Biswas completes 60% of the overall work. Had Biswas worked independently, the amount of time taken by him to complete the whole work is:?
1 Answers
5
Views
Damon can do a piece of work in 15 days and Elena in 20 days. What amount of time will they take to complete the work, if a person Stefan who does negative work, can destroy the work in 25 days when they work together.?
1 Answers
4
Views
কোরআন
হাদিস
চাকুরি প্রস্তুতি
বিশ্ববিদ্যালয় ভর্তি
মেডিকেল SBA
12
এইচএসসি
10
এসএসসি
8
জেএসসি
এক্সাম দিয়ে মেধা যাচাই করুন
Job Preparation (1125)
Admission (754)
এসএসসি (10)
এইচএসসি (5)
Login Required
You need to log in to continue.
Login
Cancel
Download Required
You need to download the app to make a call.
Download
Cancel