Bissoy.com
Login
Doctors
Medicines
MCQs
Q&A
Ask
Merit Test
Questions
Courses
In order to get maximum power transfer from a capacitive source, the load must have an impedance that is the complex conjugate of the source impedance.?
True
False
LohaHridoy
0
Edit
4
views
2025-01-04 04:42
1
Answers
AhmedNazir
Answer: Option 1
0
Thanks
4
views
Answered
2022-09-01 13:21
Report
Edit
Call
Related Questions
The load factors for live load and dead load are taken respectively as?
1 Answers
6
Views
Assertion A : The load factor for live load is greater than that for dead load.Reason R : The live loads are more uncertain than dead loads.Select your answer based on the coding system given below :?
1 Answers
6
Views
For maximum transfer of power, internal resistance of the source should be?
1 Answers
4
Views
In an RC circuit, the impedance is determined by both the resistance and the capacitive reactance combined.?
1 Answers
4
Views
In order to get maximum power transfer from a capacitive source, the load must?
1 Answers
4
Views
The simply supported beam 'A' of length '$$l$$' carries a central point load 'W'. Another beam 'B' is loaded with a uniformly distributed load such that the total load on the beam is 'W'. The ratio of maximum deflections between beams 'A' and 'B' is?
1 Answers
5
Views
A heat exchanger with heat transfer surface area A and overall heat transfer coefficient U handles two fluids of heat capacities Cmax and Cmin. The number of transfer units (NTU) used in the analysis of heat exchanger is specified as?
1 Answers
7
Views
For stable structures, one of the important properties of flexibility and stiffness matrices is that the elements on the main diagonal (i) Of a stiffness matrix must be positive (ii) Of a stiffness matrix must be negative (iii) Of a flexibility matrix must be positive (iv) Of a flexibility matrix must be negativeThe correct answer is?
1 Answers
5
Views
In a pre-stressed beam carrying an external load W with a bent tendon is having angle of inclination and pre-stressed load P. The net downward load at the centre is?
1 Answers
5
Views
In testing a pile by load test, pile platform is loaded with one and half times the design load and a maximum settlement is noted. The load is gradually removed and the consequent rebound is measured. For a safe pile, the net settlement (i.e. total settlement minus rebound) per tonne of test load should not exceed?
1 Answers
5
Views
কোরআন
হাদিস
চাকুরি প্রস্তুতি
বিশ্ববিদ্যালয় ভর্তি
মেডিকেল SBA
12
এইচএসসি
10
এসএসসি
8
জেএসসি
এক্সাম দিয়ে মেধা যাচাই করুন
Job Preparation (1125)
Admission (754)
এসএসসি (10)
এইচএসসি (5)
Login Required
You need to log in to continue.
Login
Cancel
Download Required
You need to download the app to make a call.
Download
Cancel