4 men and 5 boys can do a piece of work in 20 days while 5 men and 4 boys can do the same work in 16 days. In how many days can 4 men and 3 boys do the same work?

4 men and 5 boys can do a piece of work in 20 days while 5 men and 4 boys can do the same work in 16 days. In how many days can 4 men and 3 boys do the same work? Correct Answer 20 days

Let 1 man’s 1 day work = x

And 1 boy’s 1 day work = y

4x + 5y = 1/20      ----(1)

5x + 4y = 1/16      ----(2)

Solving (1) and (2) , x = 1/80, y = 0

∴ 4 men and 3 boy’s 1 day work = 4 × (1/80) + 0 = 1/20

Time taken by 4 men and 3 boys to do the work = 20 days