Let processes are scheduled on a system using round robin scheduling; assume that there is only one process of r time units. Round robin time quantum is q time units and process switch time is s time units. If s < q < r, then process switch over head units are
Let processes are scheduled on a system using round robin scheduling; assume that there is only one process of r time units. Round robin time quantum is q time units and process switch time is s time units. If s < q < r, then process switch over head units are Correct Answer (r/q - 1)*s
Number of context switches requires = r/q - 1
Hence overhead = (r/q - 1)*s