The toe projection of foundation slabs is taken A As one third of the base B As one sixth of overall height of the wall C Equal to heel slab D Below ground surface The toe projection of foundation slabs is taken Correct Answer As one third of the base Bissoy MCQ Team Civil Engineering RCC Structures Design