A pump can fill with water in 2 hours. Because of a leak, it took 213 hours to fill the bank . The leak can drain all water of the tank in:
A
413hrs.
B
7 hrs.
C
8 hrs
D
14 hrs.
Correct Answer: 14 hrs.
Because of leak fill the tank in 7/3 h In 1 hour fill the tank 3/7 part Fill the tank in 2 hour So in 1 hour fill the tank 1/2 part ATQ, 1/2 - 3/7 = 1/14 part in 1 hour So, 1 part fill the tank 14 hour ans: 14 hrs