The value of L=3 in the genera model of control limits for a Shewhart control chart, explains ____________

The value of L=3 in the genera model of control limits for a Shewhart control chart, explains ____________ Correct Answer There are 3 sigma limits taken

The value of L=3 in the general model of control limits for a Shewhart control chart signifies that there are 3 sigma limits taken, i.e. the 3 times shift of the standard deviation, of the mean will be measured on either side.

Related Questions

Which of this stands correct for the relation between the ARL for a shewhart control chart and the individual control chart ARL?
Which of these is not an advantage of using a Shewhart control chart with the EWMA chart?
What is analogous to the control limits as in Shewhart control charts, in the cusum status charts?