Lead screw of lathe have double start thread with a pitch of 4mm. What should be the ratio of speed between lead screw and spindle for producing a single start thread of 2 mm pitch?

Lead screw of lathe have double start thread with a pitch of 4mm. What should be the ratio of speed between lead screw and spindle for producing a single start thread of 2 mm pitch? Correct Answer 1:4

Number of starts and pitch of lathe is directly proportional to speed of spindle required.

Related Questions

Let screw of 2mm pitch is needed to be cut on lathe machine. Lead screw of lathe has pitch of 6mm. Which of the following statement is correct?
Let screw of 10mm pitch is needed to be cut on lathe machine. Lead screw of lathe has pitch of 6mm. Which of the following statement is correct?