Which of the following scheduling test can be used to show that no scheduling exist?

Which of the following scheduling test can be used to show that no scheduling exist? Correct Answer necessary test

The necessary and sufficient conditions are used in the schedulability test. For necessary condition, the test is based only on the necessary conditions and it also can be used to show that no schedule exists. The sufficient condition indicates that no schedule exists even if there exists one.

Related Questions

Which scheduling test is used to indicate that no scheduling exist even if there exist one?
In this figure, 3 types of scheduling using preemptive scheduling policies is shown. Which of the following options is correctly referring to each of these scheduling types?