Which scheduler takes their designs at design time?

Which scheduler takes their designs at design time? Correct Answer static scheduler

The static scheduler take their designs at the design time and it also generates tables of start times which are forwarded to a simple dispatcher but the dynamic scheduler takes a decision at the run-time.
Bissoy MCQ

Related Questions

The primary distinction between the short term scheduler and the long term scheduler is __________