With reference to the National Monetisation pipeline (NMP), consider the following statements. 1. It is an effort to list out the government’s infrastructure assets to be sold over the next four years. 2. Currently, only assets of central government line ministries and CPSEs in infrastructure sectors have been included. 3. Monetization through disinvestment and monetization of non-core assets is also included in the NMP. Which of the statements given above is/are correct?

With reference to the National Monetisation pipeline (NMP), consider the following statements. 1. It is an effort to list out the government’s infrastructure assets to be sold over the next four years. 2. Currently, only assets of central government line ministries and CPSEs in infrastructure sectors have been included. 3. Monetization through disinvestment and monetization of non-core assets is also included in the NMP. Which of the statements given above is/are correct? Correct Answer 1 and 2 only

The correct answer is 1 and 2 only.

  • In News:
    • ​The Centre launched the National Monetisation pipeline (NMP) in an effort to list out the government’s infrastructure assets to be sold over the next four years. Hence, statement 1 is correct.

Key Points

  • Key features:
    • The four-year National Monetisation Pipeline (NMP) will unlock value in brownfield projects by engaging the private sector, transferring to them the rights but not the ownership in projects.
    • Components: Roads, railways and power sector assets will comprise over 66 per cent of the total estimated value of the assets to be monetised, with the balance coming from sectors including telecom, mining, aviation, ports, natural gas and petroleum product pipelines, warehouses and stadiums.
  • The Framework:
    • Currently, only assets of central government line ministries and CPSEs in infrastructure sectors have been included. Hence, statement 2 is correct.
    • Monetization through disinvestment and monetization of non-core assets have not been included in the NMP. Hence, statement 3 is not correct.
  • The objective of the programme:
    • To unlock the value of investments in brownfield public sector assets by tapping institutional and long-term capital, which can thereafter be leveraged for public investments.
    • To enable ‘Infrastructure Creation through Monetisation’ wherein the public and private sector collaborate, each excelling in their core areas of competence, so as to deliver socio-economic growth.

Related Questions

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
Which of the following were not problems faced while constructing the pipeline?
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
The Alaskan pipeline ends
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
What is the capacity of the Alaskan pipeline?
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
How was the fund for pipeline - construction generated?
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
What are "bents"?
Read the passage carefully and choose the best answer to each question out of the four alternatives.
Eight north Indian Ocean countries, namely, Bangladesh, India, the Maldives, Myanmar, Oman, Pakistan, Sri Lanka and Thailand, were asked to contribute names so that a combined list could be compiled. Each country gave eight names and a combined list of 64 names was prepared. This list is currently in use, and all cyclones arising in the north Indian Ocean are named from this list, with one name from each country being used in turn. Almost 38 or 39 names from the list have been used up, but since many cyclones dissipate long before they hit land, their names rarely figure in the papers or other media. The names that people do know about, and remember are, naturally, those that were most destructive ones, or very recent. Aila, in 2009 is remembered with a shudder for the enormous destruction it caused in West Bengal and Bangladesh; Phaillin, also for the damage it caused when it hit the Odisha coast in 2013. Two harmless cyclones, which also might remain in peoples memory, are the more recent ones of 2014 — Hudhud, which threatened the east coast of India and Nilofar, which was expected to, but did not, devastate the western coast. The names in the cyclone list are usually words one associates with storms; words which mean water or wind or lightning in various national languages. Sometimes they are names of other things — birds or flowers or precious stones. The name Aila, contributed by the Maldives means fire, the name Phaillin from Thailand means sapphire, the name Hudhud from Oman is the name of a bird, probably the hoopoe, and the name Nilofar, given by Pakistan, is the Urdu name of the lotus or water lily. The eight names suggested by India, and which are in the list of 64, are Agni, Akaash, Bijli, Jal, Leher, Megh, Sagar and Vayu, meaning in that order, fire, sky, lightning, water, wave, cloud, sea and wind. Five of these names (that is, up to Leher) have been used so far.
Which country did not contribute to the list of the cyclone names?
Read the passage carefully and choose the best answer to each question out of the four alternatives.
Eight north Indian Ocean countries, namely, Bangladesh, India, the Maldives, Myanmar, Oman, Pakistan, Sri Lanka and Thailand, were asked to contribute names so that a combined list could be compiled. Each country gave eight names and a combined list of 64 names was prepared. This list is currently in use, and all cyclones arising in the north Indian Ocean are named from this list, with one name from each country being used in turn. Almost 38 or 39 names from the list have been used up, but since many cyclones dissipate long before they hit land, their names rarely figure in the papers or other media. The names that people do know about, and remember are, naturally, those that were most destructive ones, or very recent. Aila, in 2009 is remembered with a shudder for the enormous destruction it caused in West Bengal and Bangladesh; Phaillin, also for the damage it caused when it hit the Odisha coast in 2013. Two harmless cyclones, which also might remain in peoples memory, are the more recent ones of 2014 — Hudhud, which threatened the east coast of India and Nilofar, which was expected to, but did not, devastate the western coast. The names in the cyclone list are usually words one associates with storms; words which mean water or wind or lightning in various national languages. Sometimes they are names of other things — birds or flowers or precious stones. The name Aila, contributed by the Maldives means fire, the name Phaillin from Thailand means sapphire, the name Hudhud from Oman is the name of a bird, probably the hoopoe, and the name Nilofar, given by Pakistan, is the Urdu name of the lotus or water lily. The eight names suggested by India, and which are in the list of 64, are Agni, Akaash, Bijli, Jal, Leher, Megh, Sagar and Vayu, meaning in that order, fire, sky, lightning, water, wave, cloud, sea and wind. Five of these names (that is, up to Leher) have been used so far.
For the next cyclone if it is the turn of an Indian name to be chosen, then what will be that name?
Read the passage carefully and choose the best answer to each question out of the four alternatives.
Eight north Indian Ocean countries, namely, Bangladesh, India, the Maldives, Myanmar, Oman, Pakistan, Sri Lanka and Thailand, were asked to contribute names so that a combined list could be compiled. Each country gave eight names and a combined list of 64 names was prepared. This list is currently in use, and all cyclones arising in the north Indian Ocean are named from this list, with one name from each country being used in turn. Almost 38 or 39 names from the list have been used up, but since many cyclones dissipate long before they hit land, their names rarely figure in the papers or other media. The names that people do know about, and remember are, naturally, those that were most destructive ones, or very recent. Aila, in 2009 is remembered with a shudder for the enormous destruction it caused in West Bengal and Bangladesh; Phaillin, also for the damage it caused when it hit the Odisha coast in 2013. Two harmless cyclones, which also might remain in peoples memory, are the more recent ones of 2014 — Hudhud, which threatened the east coast of India and Nilofar, which was expected to, but did not, devastate the western coast. The names in the cyclone list are usually words one associates with storms; words which mean water or wind or lightning in various national languages. Sometimes they are names of other things — birds or flowers or precious stones. The name Aila, contributed by the Maldives means fire, the name Phaillin from Thailand means sapphire, the name Hudhud from Oman is the name of a bird, probably the hoopoe, and the name Nilofar, given by Pakistan, is the Urdu name of the lotus or water lily. The eight names suggested by India, and which are in the list of 64, are Agni, Akaash, Bijli, Jal, Leher, Megh, Sagar and Vayu, meaning in that order, fire, sky, lightning, water, wave, cloud, sea and wind. Five of these names (that is, up to Leher) have been used so far.
Which name suggested by India has not been used so far?