Which of the following statements is correct about the "Tawa Project"? 1) The project was constructed in 1970 on Tawa river. 2) It is one of the most important project to be undertaken in the Narmada basin.
Which of the following statements is correct about the "Tawa Project"? 1) The project was constructed in 1970 on Tawa river. 2) It is one of the most important project to be undertaken in the Narmada basin. Correct Answer Only 2
The correct answer is Only 2.
Tawa Project -
- The Tawa project was constructed in 1974 on the Tawa river near village Ranipur in the Hoshangabad district.
- The Tawa river is a tributary of the Narmada river of central India.
- The length of the river is 117 Km and originates from the Satpura range.
- The Tawa dam has a catchment area up to 5,983 Sq Km.
- The dam is operated to supply water for irrigation and municipal uses.
- The maximum water level for this dam is 356.66 m.
- It is a composite dam of earth and masonry 1, 630 m long.
- There are canals on each bank of the river -
1) The left bank canal is 120 Km.
2) The right bank canal is 76.85 Km long.