Consider the following statements related to the merits of construction in structural steel: 1. Structural steel has high strength per unit weight as compared to RCC. 2. The steel members are slender or small in size as compared to RCC. 3. The steel structures are useful in the construction of tall buildings, long-span bridges, and airplane hangers. Which of the above statements are correct?

Consider the following statements related to the merits of construction in structural steel: 1. Structural steel has high strength per unit weight as compared to RCC. 2. The steel members are slender or small in size as compared to RCC. 3. The steel structures are useful in the construction of tall buildings, long-span bridges, and airplane hangers. Which of the above statements are correct? Correct Answer 1, 2 and 3

TB Solution

The merits of construction in structural steel :

1. Structural steel has high strength per unit weight as compared to RCC.

2. The size of steel structures elements is small, saving space in construction.

3. It has high durability.

4. Important advantage of the steel structure is the lesser time of project completion as compared to the RCC project.

5. Materials are reusable.

6. Steel structures can easily be dismantled and transported to other sites quickly.

Additional Information Disadvantantages of construction in structural steel:

1. It is susceptible to corrosion.

2. Maintenance cost is high.

3. Steel members are costly.

 Important PointsIS456-2000: Referred for the use of steel bars in concrete construction.

IS800-2007: Referred for steel structure construction.

Related Questions

The following are the conditions for selecting list of a suitable candidates to be called for interview after the written test for the recruitment is conducted/ organized for management-level persons of a multi-national company. For providing accounting services and sales the candidate must (a) be holding a graduation in basic science with 65% or above or B.E degree with 55% and above marks (b) have passed the written test with 70% or above marks (c) the age must be in the group 25 to 30 yrs as on 1/4/18 (d) have experience in an accounting firms for three yrs and diploma in accounting with 60% or above marks (e) be presently drawing CTC of 6 Lakhs per annum and above In case the applicant who satisfies all other terms above except 1) at (a) above, then be referred as Junior Accountant 2) at (d) & (e) above then be referred as Trainee-Accountant Satisfying all the above with experience of 5 yrs then be referred as senior-Accountant Satisfying all the above criteria (a-e) with CA/ ICWA/ MBA (Finance) then be refereed as manager (Accounts) Read all the above information and answer the following question: Radha Mohan has done her graduation in physics with 58% of marks. She has passed the written examination with 76% of marks. She is 27 yrs as on June 2018. She has the experience in the accounting company for four years with salary of 7 Lakhs per annum. She also has passed diploma in accounting with 61% of marks. She may be referred for the position of:
Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it. The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.
How was the fund for pipeline - construction generated?