1 Answers
The Task Control Block contains the state of a task in, e.g., OS/360 and successors on IBM System/360 architecture and successors.
8 views
Answered
The Task Control Block contains the state of a task in, e.g., OS/360 and successors on IBM System/360 architecture and successors.