Accelerated Irrigation Benefits Programme
- The Accelerated Irrigation Benefits Programme was launched in 1996-97 to give loan assistance to the states to help them to develop its major irrigation projects which are in an advanced stage of completion. Hence, statement 1 is incorrect.
- Projects: Major, medium, and extension, renovation and modernization projects which were cleared by the Planning Commission are in an advanced stage of construction.
- Surface minor irrigation schemes states of North East, hilly States, drought-prone areas were also covered under AIBP assistance since 1999 -2000.
- The assistance was shared between the centre and state in the ratio 2:1.
Command Area Development Programme
- The command area development programme was launched in 1974-75 to bridge the gap between irrigation potential actually utilised major and medium irrigation schemes. Hence, statement 2 is correct.
- Delivery of irrigation water to the fields is the ultimate objective of this scheme.
- A command area development authority was established to maximize productivity channels.
- Construction of field channels, land shaping, rotational water supply to ensure equitable distribution are an integral part of the scheme.
- It was restructured into Command Area Development and Water Management Program 2004.