Work study deals with the __________ study.?
Time
Motion
Both A & B
Neither A nor B
LohaHridoy
0
Edit
4
views
2025-01-04 04:42
1
Answers
AhmedNazir
Answer: Option 3
0
Thanks
4
views
Answered
2022-09-01 13:21
Report
Edit
Call
Related Questions
Maximum work that could be secured by expanding the gas over a given pressure range is the __________ work.?
1 Answers
4
Views
The expression for the work done for a reversible polytropic process can be used to obtain the expression for work done for all processes, except reversible __________ process.?
1 Answers
4
Views
In the converter of the contact process for the manufacture of H₂SO₄ the equilibrium conversion of SO₂ __________ (i) __________ with increase in temperature and __________ (ii) __________ with increase in the mole ratio of SO₂ to air.?
1 Answers
6
Views
Psychrometry deals with the properties of gas-vapor mixture. Humidity can be determined by the measurement of the __________ of a fibre.?
1 Answers
4
Views
41 girls can complete a piece of work in 40 days. If x girls started the work and after 30 days 64 more girls joined them so that the whole work gets finished in the desired time, find the value of x.?
1 Answers
11
Views
Three statements are given, followed by three conclusions. Assuming the statement to be true, even if they seem to be at variance with commonly known facts, decide which of the conclusions logically follow(s) from the statements. Statements: 1. All children study in class V. 2. Some children go to coaching. 3. Some children are brilliant. Conclusions: I. All children who go to coaching are brilliant. II. Children who go to coaching also study in class V. III. All children who study in class V are not brilliant.?
1 Answers
4
Views
P can complete \(\frac{1}{4}\) of a work in 10 days, Q can complete 40% of the same work in 145 days. R completes \(\frac{1}{3}\) of the work in 13 days and S, \(\frac{1}{6}\) of the work in 7 days. Who will be able to complete the work first?
1 Answers
5
Views
A does \(\frac{4}{5}\) of a piece of work in 20 days; He then calls in B and they finish the remaining work in 3 days. How long B alone will take to do whole work ?
1 Answers
4
Views
A and B can complete a piece of work in 50 days and 80 days respectively. They begin the work together, but A left after some days and the whole work is completed in 48 days. After how many days A left ?
1 Answers
6
Views
E and C mutually like to work with each other. A likes to work with C and H. H and L do not like to work with anyone. Who is isolated in the office?
1 Answers
5
Views
কোরআন
হাদিস
চাকুরি প্রস্তুতি
বিশ্ববিদ্যালয় ভর্তি
মেডিকেল SBA
12
এইচএসসি
10
এসএসসি
8
জেএসসি
এক্সাম দিয়ে মেধা যাচাই করুন
Job Preparation (1125)
Admission (754)
এসএসসি (10)
এইচএসসি (5)
Login Required
You need to log in to continue.
Login
Cancel
Download Required
You need to download the app to make a call.
Download
Cancel