If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then the following relation holds good?
EF = ES + D
LS = LF - D
LF = LS + D
All the above
LohaHridoy
0
Edit
6
views
2025-01-04 04:42
1
Answers
AhmedNazir
Answer: Option 4
0
Thanks
6
views
Answered
2022-09-01 13:21
Report
Edit
Call
Related Questions
If the values Earliest time and Latest time of an event are not equal then such events are referred to as:?
1 Answers
4
Views
Hook's law holds good up to?
1 Answers
4
Views
Hooke's law holds good up to?
1 Answers
4
Views
In Diesel engines, the duration between the time of injection and the time of ignition is called?
1 Answers
4
Views
Earliest finish time can be regarded as?
1 Answers
4
Views
If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good?
1 Answers
5
Views
In a doubly-reinforced beam if ‘c’ and ‘t’ are stresses in concrete and tension reinforcement, ‘d’ is the effective depth and ‘n’ is depth of critical neutral axis, the following relationship holds good?
1 Answers
5
Views
If α, H, A and δ be the altitude, hour angle, azimuth and declination of a circumpolar star at its elongation, in latitude λ, the following relation holds good?
1 Answers
4
Views
Earliest finish of an activity is always?
1 Answers
4
Views
If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be?
1 Answers
5
Views
কোরআন
হাদিস
চাকুরি প্রস্তুতি
বিশ্ববিদ্যালয় ভর্তি
মেডিকেল SBA
12
এইচএসসি
10
এসএসসি
8
জেএসসি
এক্সাম দিয়ে মেধা যাচাই করুন
Job Preparation (1125)
Admission (754)
এসএসসি (10)
এইচএসসি (5)
Login Required
You need to log in to continue.
Login
Cancel
Download Required
You need to download the app to make a call.
Download
Cancel