In the penetration macadam construction, the bitumen is?

  1. Sprayed after the aggregates are spread and compacted
  2. Premixed with aggregates and then spread
  3. Sprayed before the aggregates are spread and compacted
  4. None of the above
LohaHridoy
LohaHridoy
4 views
2025-01-04 04:42

1 Answers

AhmedNazir
AhmedNazir

Answer: Option 1

4 views Answered 2022-09-01 13:21

Related Questions

Klein's construction gives a graphic construction for?
1 Answers 5 Views
These maps are used to plan construction projects that locate construction features so they fit the topography of the area:?
1 Answers 4 Views
Bitumen felt is used for?
1 Answers 4 Views
The filler used in plastic bitumen, is?
1 Answers 4 Views
Bitumen felt?
1 Answers 4 Views
The camber of shoulders in water bound macadam roads is?
1 Answers 4 Views
The ductility value of bitumen for suitability in road construction should not be less than?
1 Answers 5 Views
For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is?
1 Answers 4 Views
Penetration test on bitumen is used for determining its?
1 Answers 4 Views
For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is?
1 Answers 4 Views
  • কোরআন
  • হাদিস
  • চাকুরি প্রস্তুতি
  • বিশ্ববিদ্যালয় ভর্তি
  • মেডিকেল SBA
  • 12 এইচএসসি
  • 10 এসএসসি
  • 8 জেএসসি
এক্সাম দিয়ে মেধা যাচাই করুন
Job Preparation (1125)
Admission (754)
এসএসসি (10)
এইচএসসি (5)
Login Required

You need to log in to continue.

Login
Download Required

You need to download the app to make a call.

Download
ভিডিও কলে কথা বলতে প্লে স্টোর থেকে Bissoy অ্যাপ ডাউনলোড করুন অথবা প্রশ্ন উত্তর করতে লগইন করুন
📱 ডাউনলোড
  • অ্যাফিলিয়েট
  • FAQ
  • About Us
  • Privacy Policy
  • T&C
  • DMCA

© Bissoy, 2014 - 2025