Bissoy.com
Login
Doctors
Medicines
MCQs
Q&A
Ask
Merit Test
Questions
Courses
The most suitable location of a canal head work, is?
Boulders stage of the river
Delta stage of the river
Rock stage of the river
Trough stage of the river
LohaHridoy
0
Edit
5
views
2025-01-04 04:42
1
Answers
AhmedNazir
Answer: Option 4
0
Thanks
5
views
Answered
2022-09-01 13:21
Report
Edit
Call
Related Questions
If Hg is the gross or total head and hf is the head lost due to friction, then net or effective head (H) is given by?
1 Answers
4
Views
The static head of a centrifugal pump is equal to the _________ of suction head and delivery head.?
1 Answers
5
Views
The main function of a diversion head works of a canal from a river, is?
1 Answers
4
Views
The most suitable section of a lined canal, is?
1 Answers
4
Views
The crest level of a canal diversion head work, depends upon?
1 Answers
4
Views
If the straight sides of a triangular section of a lined canal with circular bottom of radius R, make an angle θ with horizontal, the perimeter of the canal is?
1 Answers
5
Views
The drainage water intercepting the canal can be disposed of by passing the canal below the drainage in?
1 Answers
4
Views
The net positive suction head (NPSH) of a centrifugal pump is defined as the sum of the velocity head and the pressure head at the?
1 Answers
5
Views
Suez Canal route handles more traffic than the Panama Canal route mainly because?
1 Answers
4
Views
P can complete \(\frac{1}{4}\) of a work in 10 days, Q can complete 40% of the same work in 145 days. R completes \(\frac{1}{3}\) of the work in 13 days and S, \(\frac{1}{6}\) of the work in 7 days. Who will be able to complete the work first?
1 Answers
5
Views
কোরআন
হাদিস
চাকুরি প্রস্তুতি
বিশ্ববিদ্যালয় ভর্তি
মেডিকেল SBA
12
এইচএসসি
10
এসএসসি
8
জেএসসি
এক্সাম দিয়ে মেধা যাচাই করুন
Job Preparation (1125)
Admission (754)
এসএসসি (10)
এইচএসসি (5)
Login Required
You need to log in to continue.
Login
Cancel
Download Required
You need to download the app to make a call.
Download
Cancel