Initial setting time of cement for asbestos cement products should be not less than?

  1. 30 minutes
  2. 50 minutes
  3. 75 minutes
  4. 90 minutes
LohaHridoy
LohaHridoy
11 views
2025-01-04 04:42

1 Answers

AhmedNazir
AhmedNazir

Answer: Option 4

11 views Answered 2022-09-01 13:21

Related Questions

Assertion A : For identical strength, a composite cement-lime mortar is preferred over cement mortar.Reason R : Composite cement-lime mortar has higher drying shrinkage than cement mortar.Select your answer based on the codes given below. Codes:?
1 Answers 5 Views
The maximum permissible span of asbestos cement sheets is?
1 Answers 6 Views
Normally, the angle of roof truss with asbestos sheets should not be less than?
1 Answers 14 Views
As per IS specifications, the maximum final setting time for ordinary Portland cement should be?
1 Answers 4 Views
Initial setting of cement is caused due to?
1 Answers 4 Views
The initial setting time for ordinary Portland cement as per IS specifications should not be less than?
1 Answers 5 Views
Asbestos cement?
1 Answers 5 Views
To retard the initial setting time of cement, the compound responsible, is?
1 Answers 4 Views
The asbestos cement sewers are?
1 Answers 4 Views
The asbestos cement pipes are generally laid?
1 Answers 4 Views
  • কোরআন
  • হাদিস
  • চাকুরি প্রস্তুতি
  • বিশ্ববিদ্যালয় ভর্তি
  • মেডিকেল SBA
  • 12 এইচএসসি
  • 10 এসএসসি
  • 8 জেএসসি
এক্সাম দিয়ে মেধা যাচাই করুন
Job Preparation (1125)
Admission (754)
এসএসসি (10)
এইচএসসি (5)
Login Required

You need to log in to continue.

Login
Download Required

You need to download the app to make a call.

Download
ভিডিও কলে কথা বলতে প্লে স্টোর থেকে Bissoy অ্যাপ ডাউনলোড করুন অথবা প্রশ্ন উত্তর করতে লগইন করুন
📱 ডাউনলোড
  • অ্যাফিলিয়েট
  • FAQ
  • About Us
  • Privacy Policy
  • T&C
  • DMCA

© Bissoy, 2014 - 2025