Three workers can do a job in 12 days. Two of the workers work twice as fast as the third. How long would it take one of the faster workers to do the job himself ?
A
24
B
30
C
32
D
None of these
Correct Answer: 30
1 faster person = 2 slower person so , 2 faster + one slower = 5 slower person 5 slower person can do the work in 12 days 1 ,, ,, ,, ,, 12X5 days = 60 days As, 2 slower = 1 faster then, 1 faster person can do the work in 60/2 = 30 days