A push through system, according to which goods are manufactured for finished inventory solely, on basis of forecasted demand can be classified as
A push through system, according to which goods are manufactured for finished inventory solely, on basis of forecasted demand can be classified as Correct Answer materials requirement planning
A push through system, according to which goods are manufactured for finished inventory solely, on basis of forecasted demand can be classified as materials requirement planning. Material requirements planning (MRP) is a system for calculating the materials and components needed to manufacture a product.