A push through system, according to which goods are manufactured for finished inventory solely, on basis of forecasted demand can be classified as
A
in-time production
B
materials requirement planning
C
on-time production
D
pull strategy of production
Correct Answer: materials requirement planning
A push through system, according to which goods are manufactured for finished inventory solely, on basis of forecasted demand can be classified as materials requirement planning. Material requirements planning (MRP) is a system for calculating the materials and components needed to manufacture a product.