The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing.

The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing. Correct Answer 20-40

Related Questions

At the following point for a given packing and set of fluids, the pressure drop per metre of packed height, with variation in fluid rates and operating pressure