The most suitable location of a canal head work, is A Boulders stage of the river B Delta stage of the river C Rock stage of the river D Trough stage of the river The most suitable location of a canal head work, is Correct Answer Trough stage of the river Bissoy MCQ Team Civil Engineering Irrigation Engineering