For ship vessel industry the following layout is best suited

A Process layout
B Product layout
C Fixed position layout
D Plant layout

Correct Answer: Fixed position layout

In a fixed position layout, personnel, supplies and equipment are brought to the site where the product will be assembled, rather than the product being moved through an assembly line or set of assembly stations.
Other fixed position layout examples include construction shipbuilding, aircraft, aerospace, farming, drilling for oil, home repair and automated car washes.

Related Questions

Product layout is best suited where
The process layout is best suited where
This is the last time I'm telling you to arrive on time. Shape up or ship out. Here, ‘’shape up or ship out'' means-
The rotor of a ship rotates in clockwise direction when viewed from stern and the ship takes a left turn. The effect of gyroscopic couple acting on it will be
It is found that a ship to ship communication suffers from fading. This can be avoided by using

Next steps